
The David
640 Sqft (20' x 32')
Built in 90 days
2 Bed
1 Bath
Full Kitchen
The David plan usually takes less than 12 weeks, from foundation to final inspection.

Michelle Vallejos
SALES
Contact
Contact
More Standard Plans
The David Plan is part of the
San Jose ADU Pilot Program
Features
Standard Equipment
—————
- Concrete slab foundation
- Fiber cement lap siding
- 8ft sidewall height
- Composition roof
- Vinyl, dual glaze, low E windows Insulation R15:walls & R30:roof
- 36” Exterior door (fiberglass standard)
- 5” baseboards throughout
- Carpet throughout
Utility:
- Tankless water heater
- Mini split heating/cooling
- 100AMP electrical subpanel
- Raised Panel cabinets
- Laminate countertops
- Drop-in sink
- 2 burner cook top
- Recessed can light above
- Vanity with molded sink
- Dual handle faucet
- Fiberglass shower w/rod
- Power vent
- 1.28gpf toilet
- Chrome medicine cabinet
- Linoleum floor
Interior & Exterior Pics
The David plan actual builds
––––––––––